Champion of Wind Energy Projects

Verrill successfully permitted eleven wind power projects in Maine with an installed capacity of more than 1,000 MW. The team shepherded projects through the Land Use Regulation Commission, Department of Environmental Protection, Army Corps of Engineers, and multiple towns where project elements are located.

In the Bingham Wind project, Verrill permitted a 17 mile generator lead line that traversed organized and unorganized jurisdiction in Maine. The permits included a federal Army Corps of Engineers Section 404 permit, Maine Department of Environmental Protection Site Law and NRPA permits, as well as several local permits.

In the Saddleback Ridge Wind project, Verrill assisted Patriot Renewables in permitting 9.5 miles of generator lead in the towns of Carthage, Dixfield and Canton, Maine. The permits included a federal Army Corps of Engineers Section 404 permit, Maine Department of Environmental Protection Site Location and NRPA permits, utility location permits from the Maine DOT and the Town of Carthage, and a building permit from the Town of Dixfield.

Firm Highlights

Blog

Maine Legislature Adopts Major Revision to Its Net Energy Billing Program

On July 1, 2021, LD 936, An Act To Amend State Laws Relating to Net Energy Billing and the Procurement of Distributed Generation became law after Maine Governor Janet Mills allowed the legislatively enacted...

Matter

Verrill Helps Hancock Solar Project Obtain MDEP Permit, Protect Upland Sandpipers

The 14-megawatt Hancock Solar project in the town of Hancock, Maine has obtained its Site Law permit from the Maine Department of Environmental Protection. Verrill assisted the project with environmental permitting, which included the...

Matter

Permitting

Served as counsel to Novatus Energy LLC on several wind power projects it owns and operates in Maine, including the Bingham Wind Project, which at 186 MW is the largest wind power project in...

News

Advice from Former Portland Charter Commission

On June 23, Portland Phoenix published an article, "Those who have been there predict Portland Charter Commission faces steep learning curve," discussing the organizational meeting with Portland's newly elected Charter Commission. In the meeting...

Matter

Sale of Wind Projects

Served as outside environmental counsel to SunEdison in connection with wind power projects in Maine. Following SunEdison's voluntary petition for reorganization under Chapter 11 of the Bankruptcy Code, Verrill provided advice and support in...

Matter

New Transmission Line

Represented a wind developer on the environmental and land use permits for a 15-mile, 115 kV transmission line connecting the Northern Maine transmission system to ISO-New England.

Blog

Jim Cohen Appointed to Northern New England Passenger Rail Authority

Matter

Bingham Wind Project

Verrill's environmental team successfully permitted the Bingham Wind project, which at 185 MW is the largest wind power project in New England. The project includes fifty-six 3.3 MW Vestas turbines, a transmission line, an...

Matter

Weaver Wind Project Development

Verrill represented Longroad Energy on development of the Weaver wind project in Maine. Longroad Energy is a Boston, MA-headquartered renewable energy developer focused on the development and operation of wind and solar energy projects...

Matter

Power Purchase Agreement Approvals

Represented a New York wind developer in proceedings in Connecticut, Massachusetts, and Rhode Island to obtain regulatory approval of power purchase agreements with utilities in those three states pursuant to their tristate clean energy...