Champion of Wind Energy Projects

Verrill successfully permitted eleven wind power projects in Maine with an installed capacity of more than 1,000 MW. The team shepherded projects through the Land Use Regulation Commission, Department of Environmental Protection, Army Corps of Engineers, and multiple towns where project elements are located.

In the Bingham Wind project, Verrill permitted a 17 mile generator lead line that traversed organized and unorganized jurisdiction in Maine. The permits included a federal Army Corps of Engineers Section 404 permit, Maine Department of Environmental Protection Site Law and NRPA permits, as well as several local permits.

In the Saddleback Ridge Wind project, Verrill assisted Patriot Renewables in permitting 9.5 miles of generator lead in the towns of Carthage, Dixfield and Canton, Maine. The permits included a federal Army Corps of Engineers Section 404 permit, Maine Department of Environmental Protection Site Location and NRPA permits, utility location permits from the Maine DOT and the Town of Carthage, and a building permit from the Town of Dixfield.