Resources
Experience

Local Transmission Planning Standards

Emera choose Verrill to represent it when the Maine PUC opened an investigation into certain local transmission planning standards applicable to Maine’s electric utilities. The standards or “safe harbors” are important tools in transmission planning that provide certain assumptions, such as estimating generation dispatch, that impact future reliability needs. Numerous parties participated at various stages of this lengthy proceeding, which was ultimately resolved through a Commission approved settlement.

Firm Highlights

Matter

Management Audit

Verrill represented Emera in its 2016 distribution rate case before the Maine PUC. The case involved issues relating to significant new capital investments, including Emera's new customer information system and a controversial substation investment...

Matter

Microgrids

We represented a Maine utility before the Maine PUC in a proceeding in which the utility sought approval to own and operate a microgrid to be located at its operations center. The proposed microgrid...

Matter

Stranded Cost Rate Reconciliation

We represented Emera in multiple stranded cost reconciliation cases in which stranded cost revenues and expenses are reconciled annually with forecasted revenues and expenses.

Matter

Change of Control of Emera Maine

Verrill represented Emera Maine, and its affiliates Chester SVC Partnership and Maine Electric Power Company (the “Utilities”), before the Maine PUC with respect to the Utilities’ request for Commission approval of the change of...

Matter

Rate Design

We represented Emera in a rate design case before the Maine PUC to determine whether local distribution rates should be adjusted to reflect seasonal variations in the cost of providing electric distribution service.

Matter

Standards of Conduct

Verrill represented Emera in a Maine PUC rulemaking establishing standards of conduct governing the relationship between transmission and distribution utilities and affiliated generators. The rulemaking arose from a number of earlier commission proceedings, including...

Matter

2017 Emera Distribution Rate Case

Verrill represented Emera in its 2017 distribution rate case before the Maine PUC, which included: defeating Staff's proposed reduction to allowed return on equity for "management inefficiency;" approval of new expenditures, such as an...

Matter

Rate Surcharge

Verrill represented a Maine utility in the negotiation of a temporary rate surcharge applicable to former ratepayers of an electric co-operative. The surcharge was designed to recover the incremental costs of the utility acquiring...

Matter

Non-Wires Alternatives

In litigation spanning several years, Verrill represented Emera in a Maine PUC investigation into ratemaking mechanisms associated with non-wires alternatives for Maine's investor-owned transmission and distribution utilities. That proceeding grew out of a prior...

Matter

Prudence of New Substation

Verrill represented a Maine utility in a lengthy and contentious Maine PUC case involving the prudence of the siting and design of a new substation. To address the concerns of several neighbors arising out...

Contact Verrill at (855) 307 0700